Market Intelligence

Engen-Led Consortium Outlines ZAR 40bn Durban LNG Project

A consortium headed by Engen has detailed plans for a ZAR 40 billion LNG import, power generation, and bunkering venture at the Port of Durban.

Global Freight in-house illustration
Editorial illustration — not a photograph of the events described. · Global Freight in-house illustration

African energy firm Engen is leading a consortium that has unveiled proposals for a ZAR 40 billion (£1.7 billion) liquefied natural gas development centred at the Port of Durban. The comprehensive scheme features an LNG import terminal, connecting pipeline systems, and a 1.9 GW combined cycle gas turbine power facility.

The planned power station is designed to be situated at the existing Engen refinery property, which is presently undergoing conversion into a fuel import and storage installation. Alongside grid power production, the setup could establish the necessary infrastructure to deliver LNG marine bunkering capabilities at the port.

Energy infrastructure operator VTTI has joined the proposed development group. Under the framework, VTTI is designated to oversee the development and ongoing operation of the maritime LNG import terminal.

Source attribution

Engen-led consortium sets out plans for Durban LNG-to-power project

Global Freight Briefing

The commodity and freight brief, twice weekly

Concise coverage of fuel oil, energy trading and shipping markets for professional readers. No promotional content.