Market Intelligence
BP Starts Production at Egypt's Fayoum-4 Gas Well Ahead of Schedule
BP has launched gas production from the Fayoum-4 well in Egypt's West Nile Delta roughly two years ahead of schedule, supplying about 80 million cubic feet per day.

BP has begun natural gas production from the Fayoum-4 well located in Egypt's West Nile Delta. The startup occurred approximately two years earlier than scheduled, delivering an estimated 80 million cubic feet per day to the domestic market according to local media reports.
The supplementary gas volumes arrive as lower domestic output has required Egyptian authorities to return to large-scale imports of liquefied natural gas. The development utilized existing regional systems to accelerate startup.
Fayoum-4 was tied into BP's current West Nile Delta processing infrastructure through the Giza-Fayoum pipeline, removing the requirement to build new subsea assets. BP manages the processing facilities as operator with an 82.75% participating interest alongside partner Harbour.
Source attribution
This report was written by the Global Freight editorial desk based on material published by OilPrice.com. It is an original summary and analysis, not a reproduction of the source text. Figures and claims are limited to those present in the source material.
BP Adds 80 MMcf/d to Egypt’s Gas Supply Two Years Ahead of ScheduleGlobal Freight Briefing
The commodity and freight brief, twice weekly
Concise coverage of fuel oil, energy trading and shipping markets for professional readers. No promotional content.
Related coverage
Related blogs
Further reading across commodity trading, energy and oil markets, fuel oil and shipping logistics.
- Market Intelligence
SIBCON Panels Focus on Scaling Ethanol Marine Fuel Ahead of Singapore Trial
Industry stakeholders gathered at SIBCON to discuss commercialising ethanol as a marine fuel ahead of Singapore's first planned bunkering trial.
- Market Intelligence
Singapore LNG Begins Work on Third Jetty to Expand Bunker Capacity
Singapore LNG has commenced construction of a third jetty on Jurong Island, aiming to lift terminal bunkering capacity up to 3 million tonnes annually by late 2028.
- Commodity Trading
Alkagesta charts growth and strategy at 2025 global town hall
The trading group used its annual gathering to set out priorities for the year ahead.
- Shipping & Ports
Trafigura Prepares Volare Shipping for Oslo Listing with $500m Placement
Trafigura is launching Singapore-based Volare Shipping with a $500m private placement ahead of a planned public listing in Oslo.
- Shipping & Ports
UK Maritime Groups Form Coalition to Accelerate Alternative Fuel Adoption
The UK Chamber of Shipping and Cruise Lines International Association have launched a cross-industry group to support low-carbon maritime fuel policies and infrastructure.
- Oil Trading
Jet fuel squeeze spreads from Asia towards Europe and the Americas
Reporting across four continents points to an aviation fuel shortage that began in Asia and now threatens schedules further west.

